3. Just after rig positioning, generate the casing into the bottom. Generate metal casing to some minimum a depth of 1 m below the bottom level to acquire lateral loads and actions at site. The steel casing also beat problems as a result of groundwater during piling. Targeted visitors congestion https://cesarj532sgt6.activosblog.com/profile