He included that Period two would cover the stretch within the Lekki next toll gate to the Ajah under-bridge and can be divided into four sections. “Motorists from Ajah inward Lekki is going to be diverted to 1 lane although repairs are ongoing on one other lane,” Osiyemi said. “When https://damienc320cfk3.blog-eye.com/profile