1

High-Efficiency 400 kW Chiller Installation Secures £50K Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Installation Overview Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a major confectionery manufacturing site in York. This initiative reflects a strategic step forward in the client’s ESG commitments, enhancing manufacturing reliability and delivering measurable decreases in both power usage and carbon footprint. https://tetrabookmarks.com/story20748039/energy-efficient-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story